projects

The Ferry Boat

The Noefefan bridge in Tono With a length of 380m and modern features, that bridge, after its completion, will link Pante Makassar to Citrana and Passabe and from then on towards the western border. The Power Station With 20 MW production capacity, currently lies under construction but will soon act…

Continue...

The Power Station

The Noefefan bridge in Tono With a length of 380m and modern features, that bridge, after its completion, will link Pante Makassar to Citrana and Passabe and from then on towards the western border. The Power Station With 20 MW production capacity, currently lies under construction but will soon act…

Continue...

The roads

Construction of the main road network, in particular the Urban Road of Pante Makassar and the rural one from Sakato to Lifau, prescribing a total of approximately 50 km of paved road.

Continue...

The Hotel ZEESM TL

Will include 50 executive rooms, 6 presidential suites, catering area, conference room for 250 people, meeting rooms, recreation area and has free area for future expansion.

Continue...

Tourism and Cultural Information Centre

centro_de_informacao_turistica_e_cultural

The construction of the center along the seafront will include the restoration of the old portugueses colonial building of the District of Oé-Cusse and the construction of a cultural center that will include a library, an area for cultural events and a park with natural lake.

Continue...

The International Airport of Oé-Cusse

International_Airport

Sized to receive medium aircraft (Boeing 737, Boeing Business Jet or Airbus’s A320), and will have a landing field with a length of 2.5 km, with the prevision for an extension up to 3 km, allowing the landing of any larger size aircraft. (Project subject to change).

Continue...